Project Description

Petros Batu Kawa Solar PV Integration - PV Canopy View

⛽ PETROS Multifuel Station • Batu Kawa

Solar PV & EV Charging Portfolio

A three-phase clean energy showcase uniting solar, hydrogen refuelling and EV charging.

Project Overview

Client
PETROS Multifuel Station (Batu Kawa)
Location
Batu Kawa, Sarawak
Proposal Completion Date
August 23, 2025
Order Reference
#BK-MFS-SOLAR-001
Total System Value
— (Upon Request)

🛠️Installed Components

  • 56 × Sunpal BiMAX5N 440W Bifacial Solar Panels (24.64 kWp)
  • 3 × Sunpal SPI-10K Three-Phase Hybrid Inverters (30 kW AC total)
  • 4 × Sunpal 48V 200Ah LiFePO₄ Powerwalls (optional / staged)
  • 10m Copper Red + 10m Copper Black Solar Cables
  • 12 × Solar Wiring & Integration Service Sessions
  • Smart EMS Controller with zero-export & priority loads

Three-Phase Design Notes

  • Topology: 3 × 10 kW inverters synchronised for 3-phase (400 V, 50 Hz)
  • AC Capacity: 30 kW total; DC:AC ratio 0.82 → cooler, reliable
  • MPPT Distribution: 56 modules balanced, ~7–10 per string
  • Protections: 3-phase AC isolator, DC/AC SPDs, breakers, labels, earthing (IEC)
  • EMS: CTs on incomer for zero-export; priority = station ops → EV AC posts → battery
  • Compliance: CE, RoHS, international certs; configured for self-consumption (no backfeed)

Energy Benefits

  • ~34–38 MWh/year (~95–105 kWh/day), bifacial +5–10%
  • ~500–600 km EV driving/day equivalent
  • Offsets station loads → lowers OPEX
  • Storage-ready for night/cloudy resilience & future peak shaving
  • Self-consumption / zero-export hybrid mode