Half-Cell Solar Panel Installed on Arang Roadadmin2025-06-02T04:35:29+08:00 Project Description Half-Cell Solar Panel Installed on Arang Road Project Details Categories: Residential Solar Related Projects 22 kW Hybrid Solar System with LiFePO₄ Battery – Kuching, Sarawak 22 kW Hybrid Solar System with LiFePO₄ Battery – Kuching, Sarawak October 5th, 2025 | 0 Comments 11 kW Hybrid Solar with Battery & ATS — Bau, Sarawak 11 kW Hybrid Solar with Battery & ATS — Bau, Sarawak May 29th, 2025 | 0 Comments Mr Tay’s House Solar Installation Mr Tay’s House Solar Installation October 6th, 2024 | 0 Comments Central Road Three Phase Hybrid 15,000W Solar Installation Central Road Three Phase Hybrid 15,000W Solar Installation June 17th, 2024 | 0 Comments Star Garden Double Storey House Hyrbid 5000W Installation Star Garden Double Storey House Hyrbid 5000W Installation December 17th, 2023 | 0 Comments