Project overview

Scope at a glance

Client
Residential site (anonymized)
Location
Bau, Sarawak
Project type
Single-Phase Dual Hybrid + Powerwall 200Ah + ATS
Status
Commissioned
Core completion
Mar–Apr 2025 (3 phases)
Upgrade
+12 PV Panels w/ Mounting Rails — 23 Aug 2025
Value
≈ RM 33,000 (Total)
Reference
#SP-DUAL-HYB-BAU-2025

Hardware

Installed components

Outcomes

Energy benefits

Later phase

Upgrade

+12 PV Panels w/ Mounting Rails — 23 Aug 2025

Upgrade investment: ≈ RM 13,000 (hardware + installation)

Residential Dual Hybrid · Bau, Sarawak

Phase 1 — Core home system: dual Sunpal hybrid inverters (single-phase) with rooftop BiMAX bifacial PV, tidy 4 mm² solar/DC cabling and Hager MCB / DB protection.

Phase 2 — Storage & failover: wall-mounted Sunpal LiFePO₄ Powerwall 200Ah with ATS so essential loads stay up when the grid drops.

Phase 3 — Expansion (23 Aug 2025): +12 PV panels with mounting rails, balanced into the existing dual-hybrid MPPT strings for more daytime harvest.

Next step

Ready to upgrade your home power?